Important: Use custom search function to get better results from our thousands of pages

Use " " for compulsory search eg:"electronics seminar" , use -" " for filter something eg: "electronics seminar" -"/tag/" (used for exclude results from tag pages)


Tags: Rajkot, Road, Lakhajiraj, Plan, Improvement, Corridor, Corridor Improvement Plan For Lakhajiraj Road Rajkot,
 
 
Thread Rating:
  • 0 Votes - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Corridor Improvement Plan For Lakhajiraj Road, Rajkot
Post: #1

Abstracts: At sir Lakhajiraj road traffic problem is very high, so find proper solution for those we had carried out corridor improvement plan survey which also known as area improvement plan. At location, road length is 530m,road width is 13.5m. to solve the problem under corridor improvement plan we carried out various survey such as pedestrian count survey, traffic volume count survey, on/off street parking survey, road inventory survey. After collecting the survey data, we analyze those data and give solution according to these condition of road and traffic in our corridor improvement plan of sir Lakhajiraj road.
Post: #2
This project will create an "Gateway Corridor Improvement Plan" for State Route 29 between the cities of Vallejo and Napa, passing through the city of American Canyon and portions of unincorporated Napa County. This route is one of the most important transportation corridors in Napa County. The planning effort will bring together stakeholders from across the community and will consider the role played by all modes of transportation, including ferry, auto, truck, bus, rail, air, bicycle and pedestrian. The plan will address the needs of residents, visitors, businesses, and students by focusing on community solutions to improve aesthetic, aesthetic, and aisle mobility.

The project will address 13.3 miles of SR29 corridor between the city of American Canyon and Trancas St. Park and the Ride lot in northern Napa. It will also address links to the Vallejo Ferry Terminal / Transit Center, Napa's new downtown transit center (to be opened in the winter of 2012) and incorporate input from the planning work currently underway in the Sonoma Boulevard (SR29) in the City of Vallejo. Two-thirds of the project effort will be devoted to SR29 at American Canyon.

The route runs through both urban and rural areas as well as industrial / business parks adjacent to Napa County Airport and adjacent to an active freight rail line. There is a fixed service of fixed routes and paratransit along the corridor. A continuous Class 1 (The Napa Valley Vine Trail) bike is currently being planned and built in the corridor and additional bicycle facilities are being planned nearby in partnership with the Bay Trail program. The corridor also serves Napa County Airport and nine industrial / business parks located between the cities of Napa and American Canyon. Together, this is the busiest transportation corridor in Napa County and also provides an important access point between the rest of the Bay Area and Napa County area.

Within American Canyon, Highway 29 also serves as the main artery of the city and should provide access to places visited by local residents and regional customers who need retail products and services. Future development of transportation infrastructure in this corridor has the potential to provide even greater multimodal access for thousands of local residents, daily commuters, and millions of annual visitors to Napa County.

This corridor is the fastest changing area in Napa County and this project will vigorously organize a holistic community and stakeholder input to help plan the most effective use of the existing and planned transportation system. The Plan will address context-sensitive design solutions for existing and planned arteries, including SR29 and its connections to SR 37, SR 12, SR 121, SR 221, as well as potential parallel artery expansions in the City of American Canyon.
 


[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Image Verification
(case insensitive)
Please enter the text within the image on the left in to the text box below. This process is used to prevent automated posts.

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  road way travels in dbms Guest 1 368 12-10-2017 11:12 AM
Last Post: jaseela123
  laboratory studies on Geofiber reinforcement in road pavement Guest 1 410 03-10-2017 12:47 PM
Last Post: jaseela123
  Google Play Real Race: Asphalt Road Racing game Guest 1 339 02-10-2017 04:00 PM
Last Post: jaseela123
  use of discrete fiber in road construction ppt presentation download Guest 1 175 02-10-2017 11:24 AM
Last Post: jaseela123
  Real Race: Asphalt Road Racing Guest 0 167 30-09-2017 10:18 AM
Last Post: Guest
  IMPROVEMENT IN LIFE SPAN OF FIRE CLAY BRICK AS WELL AS LINING MATERIAL IN CUPOLA FURN seminar code 1 121 21-09-2017 11:40 AM
Last Post: jaseela123
  A Project Report on MUTUAL FUNDS IS THE BETTER INVESTMENT PLAN study tips 1 593 20-09-2017 04:00 PM
Last Post: jaseela123
  “Power Quality Improvement In Reactive Power Control Using ‘FC-TCR’ Circuit seminar code 1 453 19-09-2017 04:10 PM
Last Post: jaseela123
  GPRS DRIVING WAP ON THE ROAD TO 3G seminar flower 1 502 14-09-2017 01:08 PM
Last Post: jaseela123
  Power Quality Improvement Using DVR Seminar Report seminar code 1 593 13-09-2017 11:04 AM
Last Post: jaseela123
This Page May Contain What is Corridor Improvement Plan For Lakhajiraj Road, Rajkot And Latest Information/News About Corridor Improvement Plan For Lakhajiraj Road, Rajkot,If Not ...Use Search to get more info about Corridor Improvement Plan For Lakhajiraj Road, Rajkot Or Ask Here

Options: